Product Model
| Specification | DL701 |
|---|---|
| Counterweight | 80KG |
| Net weight | 225KG |
| Maximum load capacity | 160KG |
| Wire rope tension | more than 1400KG |
| Main frame specification | Q235 material, 120*75*3.0mm bread-type pipe |
| Other pipes | 120*50*3.0mm flat elliptic pipe |
| Product size | 1173*1333*1660mm |
| Seat cushion | one-piece foam, high-grade PU leather cover, aluminum alloy force arm parallelogram structure, torsion spring assisted lift adjustment. |

The press arms on DL701 are checked through the full arc at shoulder and chest height before the 80 kg stack is boxed.
Frequently Asked Questions
Specification, MOQ, lead time, warranty and certification questions about this machine.
What is the weight stack on the DL701?
The DL701 uses an 80 kg weight stack, and maximum user load is 160 kg. The cable is rated above 1400 kg. Stack increments and pivot geometry are set for high-repetition commercial use rather than light home training, which is why the same frame holds up in unsupervised gyms.
What is the footprint of the DL701?
It measures 1173 × 1333 × 1660 mm (L x W x H). Net weight is 225 kg. Allow extra clearance at the front for handle and arm travel, and keep the unit on a level, load-bearing floor finish: a frame this heavy will rock on an uneven slab and the pivot will wear early.
What steel frame does the DL701 use?
Main frame is Q235 steel, 120 × 75 × 3.0 mm bread-type tube; secondary tubes are 120 × 50 × 3.0 mm flat oval tube. This is the tube specification used across our commercial range, so the same frame carries hotel and club traffic without flexing, and it is the reason the unit is rated for unsupervised member use rather than home training.
How heavy is the DL701 and what does that mean for installation?
Net weight is 225 kg. It ships partly assembled; site work is positioning, stack loading and a full cable and pivot check before handover. Two people with a pallet truck can move it, and no floor anchoring is needed on a level slab.
What is the minimum order quantity for the DL701?
The order minimum is ten units in total, and it applies to the whole order, not to any single model. One unit of this machine is enough, with the remaining nine made up from other equipment. Ten units matches the equipment count of a small 50 sqm gym, which normally needs ten to eleven pieces.
What is the lead time for the DL701?
Lead time runs from order confirmation to cargo ready at Shenzhen port, excluding ocean freight. In-stock models ship in 7-10 days, regular production takes 25-35 days, and customised or private-label orders need 35-45 days including sample approval. We quote the sea leg separately so nothing is hidden inside one vague date.
What warranty covers the DL701?
One year on the whole unit. Frame, weight stack, cable and pivot are all covered against manufacturing defects and functional failure under normal commercial use. Upholstery pads, grips and cables are wear parts and sit outside the warranty, as does damage from misuse or unauthorised modification.
What are the payment terms, and can I inspect before shipment?
Payment is completed before shipment: deposit to book production, balance before the container leaves. Because that is stricter than documents against acceptance, we back it with an inspection right: your own agent or SGS, BV or TUV can come to the factory before you release the balance, and every container ships with loading photos and a loading plan.
Is the DL701 CE certified?
It is manufactured to meet or exceed EN ISO 20957-1 and the applicable part of the EN 957 series: EN 957-2 for strength equipment, EN 957-5 for exercise bikes, EN 957-6 for treadmills, EN 957-9 for ellipticals. Our production partners run CE-certified lines for these categories, but because we sell under our own brand and model names the certificate is not issued in our name, so we state compliance with the standard rather than claim a certificate. Tell us what your tender or customs broker requires before ordering and we will confirm what can be provided.
Can the DL701 be supplied with our own branding or mixed with other models?
Both are routine. We run OEM and ODM work for brands and distributors: logo, colour, packaging and nameplate. Mixed-model orders are how most first orders are built. Tooling-free changes are quick; anything that needs a new mould or frame change is quoted with its own lead time.
What drawings and documents come with the DL701 order?
We issue a CAD floor plan, a full equipment list with item counts and a budget range for the area you send us, plus installation manuals and a loading plan with each shipment. Drawings go out before the order is placed, so machine spacing and circulation can be checked against the room before anything is cut or shipped.









