Product Model

Specification DL703
Counterweight 90KG
Net weight 210KG
Maximum load capacity 160KG
Wire rope tension more than 1400KG
Main frame specification Q235 material, 120*75*3.0mm bread-type pipe
Other pipes 120*50*3.0mm flat elliptic pipe
Product size 1258*1092*1660mm
Seat cushion one-piece foam, high-grade PU leather cover, aluminum alloy force arm parallelogram structure, torsion spring assisted lift adjustment.

 

Lower Pec Fly Machine DL703
Lower pec fly machine DL703, 90 kg stack, 1258 x 1092 x 1660 mm, 160 kg user rating.

 

A 90 kg stack on a fly machine gives 5 kg steps at the handle, so the cam on DL703 is checked against that ratio and not against the plate weight.

 

Frequently Asked Questions

Specification, MOQ, lead time, warranty and certification questions about this machine.

What is the weight stack on the DL703?

The DL703 uses a 90 kg weight stack, and maximum user load is 160 kg. The cable is rated above 1400 kg. Stack increments and pivot geometry are set for high-repetition commercial use rather than light home training, which is why the same frame holds up in unsupervised gyms.

What is the footprint of the DL703?

It measures 1258 × 1092 × 1660 mm (L x W x H). Net weight is 210 kg. Allow extra clearance at the front for handle and arm travel, and keep the unit on a level, load-bearing floor finish: a frame this heavy will rock on an uneven slab and the pivot will wear early.

What steel frame does the DL703 use?

Main frame is Q235 steel, 120 × 75 × 3.0 mm bread-type tube; secondary tubes are 120 × 50 × 3.0 mm flat oval tube. This is the tube specification used across our commercial range, so the same frame carries hotel and club traffic without flexing, and it is the reason the unit is rated for unsupervised member use rather than home training.

How heavy is the DL703 and what does that mean for installation?

Net weight is 210 kg. It ships partly assembled; site work is positioning, stack loading and a full cable and pivot check before handover. Two people with a pallet truck can move it, and no floor anchoring is needed on a level slab.

What is the minimum order quantity for the DL703?

The order minimum is ten units in total, and it applies to the whole order, not to any single model. One unit of this machine is enough, with the remaining nine made up from other equipment. Ten units matches the equipment count of a small 50 sqm gym, which normally needs ten to eleven pieces.

What is the lead time for the DL703?

Lead time runs from order confirmation to cargo ready at Shenzhen port, excluding ocean freight. In-stock models ship in 7-10 days, regular production takes 25-35 days, and customised or private-label orders need 35-45 days including sample approval. We quote the sea leg separately so nothing is hidden inside one vague date.

What warranty covers the DL703?

One year on the whole unit. Frame, weight stack, cable and pivot are all covered against manufacturing defects and functional failure under normal commercial use. Upholstery pads, grips and cables are wear parts and sit outside the warranty, as does damage from misuse or unauthorised modification.

What are the payment terms, and can I inspect before shipment?

A deposit at order confirmation books production, and the balance is settled before the container leaves the factory. Before you pay the balance you can arrange inspection by your own agent or a third party such as SGS, BV or TUV at our Huizhou factory, and we send loading photos and a container loading plan for every shipment.

Is the DL703 CE certified?

The machine is built to meet or exceed EN ISO 20957-1 and the relevant part of EN 957. The production lines that build it are CE-certified for this category, but the certificate does not carry our brand or model name, so we describe the equipment as compliant with the standard instead of presenting a certificate we do not hold. If you need specific documentation for a tender or for clearance, send us the requirement before the order is placed.

Can the DL703 be supplied with our own branding or mixed with other models?

Both are routine. We run OEM and ODM work for brands and distributors: logo, colour, packaging and nameplate. Mixed-model orders are how most first orders are built. Tooling-free changes are quick; anything that needs a new mould or frame change is quoted with its own lead time.

What drawings and documents come with the DL703 order?

We issue a CAD floor plan, a full equipment list with item counts and a budget range for the area you send us, plus installation manuals and a loading plan with each shipment. Drawings go out before the order is placed, so machine spacing and circulation can be checked against the room before anything is cut or shipped.

Ask for a DL703 quotation with container loading